250m Offshore Riser Assessed. No Shutdown. No Divers. No Production Impact.
Recently, SHARK Consulting successfully completed an integrity assessment of a 250-meter offshore riser in West Africa, using Multiphonon® technology while the asset remained fully operational.
Key Outcomes
✅ 250 m of riser inspected in service
✅ 4 active corrosion indications detected
✅ No crack-like defects identified
✅ No anomalous indications detected
✅ Maximum estimated wall loss limited to 19% of nominal wall thickness
✅ 100% of indications classified as Rule 1 (Insignificant)
The assessment confirmed that the riser remains fit for continued service, with no immediate integrity concerns requiring corrective action.
What makes this approach particularly valuable is the ability to identify active degradation mechanisms while the asset is operating, allowing operators to prioritize inspection and maintenance activities based on actual integrity risk rather than assumptions.
For offshore operators, this translates into:
• Reduced shutdown requirements
• Elimination of diver intervention
• Lower HSE exposure
• Reduced offshore logistics costs
• Earlier identification of integrity threats
• More effective Risk-Based Inspection (RBI) strategies
As the industry continues to focus on extending asset life while maintaining safety and operational efficiency, technologies that deliver actionable integrity data without production disruption are becoming increasingly important.
Proud to support our clients with innovative inspection solutions that help improve decision-making, optimize maintenance planning, and enhance asset reliability.
#AssetIntegrity #Offshore #PipelineIntegrity #RiserInspection #OilAndGas #CorrosionMonitoring #InspectionTechnology #NDT #IntegrityManagement #RiskBasedInspection #OffshoreEngineering #EnergyIndustry #Multiphonon #SharkConsulting